Worked Example 2.4 (Workshop No. 3)
2.2.4 Worked Example 2.4
Design a dry detention basin for the catchment in Kuching as described in Worked Example 2.9 in Workshop No. 1.
A low flow pipe system with a capacity of 2 m3/s will bypass the basin and combine with the basin outflow in the downstream floodway.
2.2.4 Worked Example 2.4
Design a dry detention basin for the catchment in Kuching as described in Worked Example 2.9 in Workshop No. 1.
A low flow pipe system with a capacity of 2 m3/s will bypass the basin and combine with the basin outflow in the downstream floodway.